Our land survey team provided construction monitoring services for the City of Portland’s Columbia Boulevard Wastewater Treatment Plant Secondary Treatment Expansion Program project.
For this project, we developed a survey monitoring plan that describes equipment use, settlement thresholds, and frequency of measurement for observations. Survey crews provide monthly and as-needed detailed reporting to monitor the impacts of construction on existing infrastructure.
Our crews installed prisms throughout the site and used highly precise survey equipment including Trimble Sx12 total station with a 1-inch gun and Senceive remote to conduct real-time monitoring of confined underground tunnel systems and measure movement of existing tanks, walls, and buildings.
Our team coordinated seamlessly with contractor crews and maintained a high-level of awareness of all construction activities to successfully uphold the strict safety and efficiency standards this complex project demanded.